一级国产色,黄色视频免费浏览,精品人妻中文无码AV在线,亚洲色婷婷久久久综合日本

Service hotline:
0315-5913666(domestic)+1-304-960-1190(abroad)
Domestic > Kailuan Lujiatuo Coal Washing Plant Hazardous Old Renovation and Technical Upgrade Project
呂家坨(選用).jpg
  • 呂家坨(選用).jpg

Kailuan Lujiatuo Coal Washing Plant Hazardous Old Renovation and Technical Upgrade Project

Type: Coking coal preparation plant

Scale: 3.6Mt/a

Contracting mode: partial contracting and renovation projects

Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. The coarse coal slurry is sorted by the coal slurry heavy medium cyclone, while the fine coal slurry is sorted by a flotation machine. The existing system is used for flotation, pressure filtration, and concentration, and the washing water is closed loop, which is environmentally friendly and energy-saving.