一级国产色,黄色视频免费浏览,精品人妻中文无码AV在线,亚洲色婷婷久久久综合日本

Service hotline:
0315-5913666(domestic)+1-304-960-1190(abroad)
Domestic > Shenhua Ningmei Group Dawukou Coal Preparation Plant
神華寧煤集團(tuán)公司大武口選煤廠.jpg
  • 神華寧煤集團(tuán)公司大武口選煤廠.jpg

Shenhua Ningmei Group Dawukou Coal Preparation Plant

Type: Coking coal preparation plant

Scale: 3.8Mt/a

Contracting mode: design+partial equipment supply, renovation project

Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. The coarse coal slurry is sorted by the coal slurry heavy medium cyclone, the fine coal slurry is sorted by a flotation machine, the flotation clean coal is dehydrated and recovered by a filter press, and the tail coal slurry water is concentrated by a thickener and then combined with a horizontal settling filtration centrifugal dewatering machine and a filter press for dehydration and recovery. The washing water is closed loop, environmentally friendly and energy-saving.